Why does a terrazzo floor crack?

Almost always because the substrate moved and the terrazzo moved with it. A cement-bound floor is ground together with the slab, so a crack in the slab is a crack in the finish at the same line. Joints are the answer, and their layout is a design decision taken before the floor exists.
Six terrazzo processes, drawn to one scaleEach column shows the layers of one terrazzo process. Precast and cement-bound are thick; epoxy is thin; porcelain is a fired body. Dimensions are published ranges, not our measured figures.substratePrecast20 mmsubstrateCement-based12 mmsubstrateEpoxy5 mmsubstratePoured10 mmsubstrateLiquid3 mmsubstratePorcelain9 mmSections drawn to one scale from published ranges. Our measured figures are listed separately.
The six processes drawn to one scale. Layer thicknesses are published ranges.

The figures, and where each one comes from

Where the movement comes from What the floor can absorb
A cracked slab ⛔ nothing on a cement system; the crack telegraphs through
Shrinkage in the new slab joint layout, designed in advance
Thermal movement divider strips on the joint plan, not on a drawing
A flexible epoxy topping absorbs some horizontal movement, and takes a crack membrane
An antistatic floor its conductive mesh is not a movement joint

Why the processes are not interchangeable

The mechanism is worth stating plainly because it is counter-intuitive. A terrazzo floor is strong and hard and it still follows a crack in the concrete underneath, because grinding bonds the surface layer to the slab so thoroughly that they behave as one piece — which is exactly why the flatness works. The remedy is to put the movement where the floor is meant to move, and to place the joints from the slab joint plan rather than from a drawing made in the office, so the divider lines fall where the movement is. Epoxy is the exception because it is a distinct layer rather than a ground continuation, and that is also why no crack membrane is compatible with a cement system.

What these figures are, and what they are not

That cracks in an existing floor telegraph through monolithic and bonded cement terrazzo, and that no crack membrane is compatible with cement systems, are both from NTMA guidance. ⛔ NO SPACING FIGURE IS GIVEN. GB 50209-2010 requires movement joints to follow the design and requires division joints on large areas, but sets no number; the 6 metre figure in circulation could not be traced to a code and is not reproduced. ⛔ That figure for an antistatic floor's conductive mesh is a different thing and is not a joint.