How many times does a terrazzo floor get ground?
The figures, and where each one comes from
| Stage | Diamond grit | What it does |
|---|---|---|
| Rough cut | 16 to 40, metal bond | cut back to the top of the divider strips |
| Transition | 80 to 120 | remove the heavy scratches from the rough cut |
| Grout coat | epoxy slurry | fill the pinholes the rough cut exposed |
| Standard finish | 120, then 220 and 400 | the finish level the trade recognises |
| High polish | 800, 1500, 3000 | from 800 grit no topical sealer is required |
| Total passes, standard floor | not fewer than 3, GB 50209-2010 cl.5.4.5 | |
| Flatness checked with | 3 mm standard, 2 mm high-performance |
Why the processes are not interchangeable
Grinding is not a finishing step; it is how the floor is made. The aggregate is graded through the matrix, so the surface does not exist until a grinder has cut through the cement to the stone, and because the chips are at different depths a single pass would leave high stone and low cement at once. That is why each stage uses a finer grit and takes less off, and why 120 grit is the level the industry treats as the standard finish — it is the last stage that still needs a sealer over it. The flatness that results is checked against 3 millimetres on a standard floor with a straightedge, and the same 3 millimetre allowance appears in the North American system expressed over a six-foot straightedge, which is close enough to the two-metre one to be the same number said in different units.
What these figures are, and what they are not
The three-pass minimum and the 3 and 2 millimetre flatness allowances are GB 50209-2010 clause 5.4.5 and table 5.1.7. The grit sequence and the 120-grit standard finish level come from published terrazzo specifications that state they follow the NTMA epoxy guide, and from trade accounts of the same sequence; ⛔ they are practice rather than a clause, and the codes we have read set only the pass count and not the grit numbers. ⛔ We do not install floors and hold no grinding records for any floor we supplied.
If you are specifying this
These are the forms we actually supply for this question, with production photographs where we have them: