Which terrazzo system goes into a commercial building?
The figures, and where each one comes from
| System | Topping | Total build-up | Weight, lbs/sq ft | Where it goes |
|---|---|---|---|---|
| Sand cushion cement | 1/2 in | 3 in | 25 to 30 | ground-floor commercial, slab on grade |
| Bonded cement | 1/2 in | 2-1/4 in | 18 to 22 | interior and exterior, recessed slab |
| Monolithic cement | 1/2 in | 1/2 in | 5 to 7 | directly bonded to a flat slab |
| Epoxy | 3/8 in | 3/8 in | 3 to 4 | upper floors, renovations, chemical exposure |
Why the processes are not interchangeable
A commercial floor is a forty-year decision, and the number that decides it is usually not the one a designer asks about. A sand-cushion floor carries a reinforced underbed, an isolation sheet and a sand layer between the topping and the slab. That assembly is what gives it the deepest grinding reserve — it can be taken back twice over its life — and it is also what makes it impossible to add to a building that is already built, because the three inches have nowhere to come from. Epoxy gives up the reserve and gets back a floor that weighs a seventh as much, can be bonded over a cracked slab, and tolerates the cleaning chemicals a hospital or a food plant throws at it.
What these figures are, and what they are not
The weights and build-ups are from the NTMA Terrazzo Systems Reference Guide, given in inches and pounds per square foot. ⛔ Those figures are the association's systems, not our products: we supply precast, cement-bound, epoxy and poured material, and we have not published a dead-load figure for any floor we have supplied. Ask us for what we hold and we will say so. ⛔ We do not quote a deflection figure for cement-bound floors: the number in general circulation could not be traced to a standard and is not reproduced here.
If you are specifying this
These are the forms we actually supply for this question, with production photographs where we have them: