How do you install terrazzo flooring?
Reference photographs. They show the material and the finish; they are not photographs of goods we made, and the colour on screen is not a colour-match.
The figures, and where each one comes from
| Process | Fixing | Joints | Who does it |
|---|---|---|---|
| Precast | dry, on bedding | movement joints required | specialist |
| Cement-bound | wet, bonded to substrate | movement joints required | tiler |
| Epoxy | coating over prepared substrate | saw cuts only | resin specialist |
| Poured | wet, into a divider grid | divider grid does the work | terrazzo specialist |
| Porcelain | thin-bed tile | standard tile joints | tiler |
Why the processes are not interchangeable
The wet processes are ground back to the substrate, which is why the substrate is part of the specification rather than the base of it. A ground floor is a floor and its subfloor, taken as one thing. That is also why a movement joint cannot be omitted from a long run: a floor that cannot move will crack at the first seasonal movement, and it will crack where the joint should have been.
What these figures are, and what they are not
This is a description of method, not a fixing instruction. A terrazzo floor installed against the wrong substrate or without a movement-joint plan fails, and no page can carry a drawing for your building. We supply the material and we will tell you what it needs; the installation is done by a terrazzo specialist and we will say so rather than imply otherwise.
If you are specifying this
These are the forms we actually supply for this question, with production photographs where we have them: